The U.S. Department of Veterans Affairs has 14 open solicitations on the board right now, tied with the Dormitory Authority and the NYS Office of General Services for the busiest roster of any single agency tracked here.

Two of them close inside 72 hours. RFI-005272 asks for a replacement chilled water pump at a VA boiler plant in the Bronx, due November 17. RFI-005113 is a presolicitation notice for Phase III work at the VA Canandaigua campus upstate, also due November 16 — that one is still at the notice stage, meaning the agency hasn't released the full package yet; firms interested need to watch for the solicitation itself to post.

A third VA job on the board, RFI-001601, covers roof and facade repair on Buildings 6 and 7 at the Northport VA Medical Center in Suffolk County, estimated at $5 million to $10 million. That one has no due date set yet, which for a facade/restoration scope this size usually means the agency is still finalizing drawings or waiting on a design consultant — worth checking back on rather than assuming it's stalled.

The VA buys differently than city agencies do. Contracts route through the System for Award Management (SAM.gov) and carry VA-specific small-business set-asides — many VA construction solicitations are restricted to Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under the agency's 'Veterans First' contracting rule, which can shrink the bidder pool compared to an open NYC or state solicitation of similar size. A contractor who isn't SDVOSB-certified and sees a VA job posted should check the set-aside code before spending estimating hours on it.

None of these three postings show a plan-holder list or bid tabulation yet on the board.

**What to do next:** If you're SDVOSB-certified or team with one, RFI-005272's chilled water pump job is a two-day sprint — the posting is on SAM.gov under NAICS 236220. For Northport (RFI-001601), there's no due date yet, so the move is to register interest with VISN 2 contracting now and watch for the formal solicitation rather than wait for a deadline that hasn't been set. Canandaigua's Phase III notice (RFI-005113) is presolicitation only; the real due date comes later, so flag it and don't bid the notice itself.