The MTA posted a design-build solicitation for Metro-North Railroad Harlem Line Stations Package A, with proposals due January 19, 2027, according to a construction notice posted November 25 in the New York State Contract Reporter (CRN 2141217).
Design-build means one team carries both the drawings and the shovels — the MTA hires a single contractor to design the station work and build it, instead of splitting that into a design contract and a separate construction contract. NYC Transit is running the solicitation, filed under building construction rehabilitation and new construction.
“One team, drawings and shovels both — that's what design-build means on a station package like this.”
The notice does not carry a location breakdown, a dollar estimate, or a scope summary beyond the title — those details sit behind the full solicitation documents, which a contractor would need to pull to see which Harlem Line stations are actually in Package A and what accessibility work is being bid.
The MTA has been running its subway and commuter-rail accessibility upgrades in sequential lettered and numbered packages for years; a Package A on the Harlem Line puts this solicitation early in whatever sequence follows for that line, which matters for any firm already working MTA ADA or station-rehab contracts and tracking where the pipeline goes next.