New York City's Department of Transportation finished its redesign of McGuinness Boulevard in Greenpoint, Mayor Mamdani's office and DOT said Friday, closing out a project that reconfigured one of Brooklyn's most contested truck routes.
The job narrowed the roadway from a wide, high-speed commercial corridor to a layout with protected bike lanes, pedestrian islands, and a reduced number of travel lanes, according to DOT's project materials. The corridor runs through a historically industrial stretch of Greenpoint that still carries heavy truck traffic to and from manufacturing and distribution sites nearby, which made the redesign one of DOT's more closely watched capital projects this year.
For contractors, a completed DOT street redesign closes out the construction-phase work — signal upgrades, concrete island pours, bike lane protection barriers, restriping — and shifts the corridor into a maintenance posture. DOT typically bundles the next phase of work, like signal timing adjustments or protected-lane hardening, into smaller follow-on contracts rather than a single large rebid.
The project drew attention beyond the usual DOT capital calendar because McGuinness Boulevard has been the subject of a long-running local fight over truck traffic and pedestrian safety, following a 2021 pedestrian death that pushed the city toward a road-diet design over objections from some local business owners who rely on truck access.
News12 Long Island first reported the completion announcement from Mamdani and DOT on Friday.
DOT has not published a follow-on bid package for McGuinness-area signal or lane-hardening work as of Friday, according to the agency's current procurement postings.