James H Maloy, Inc. posted three separate subcontractor outreach ads in the New York State Contract Reporter on November 17, all seeking DBE/MBE/WBE/SDVOB firms, all due December 3, for three unrelated NYSDOT bridge and culvert jobs: D265854, a bridge replacement on NYS Route 5 over East Canada Creek; D265884, a culvert rehabilitation at NY Route 40 and I-87; and D265901, a bridge replacement on Route 23 over Middle Brook, according to the ads.
None of the three ads lists a dollar figure or county for the underlying NYSDOT contracts, and the ads themselves don't say whether Maloy already holds all three contracts as prime or is bidding alongside other primes and lining up subs in case it wins. What the filings do establish is that one upstate heavy-civil contractor is working three separate DOT structures at once and needs subcontractors and suppliers for all three by the same date.
“Three bridge and culvert jobs, three ads, one December 3 deadline — pick your lane.”
For a sub or supplier shopping work in bridge and culvert trades — rebar, concrete, guide rail, erosion control, trucking — that's three live conversations with one company instead of three separate cold calls to three different primes. The shared December 3 deadline means a sub has to decide fast which of the three, if any, fits its crew and schedule.
The ads don't name a pre-bid meeting, a plan room, or a contact beyond the company name, which is standard for NYSCR subcontractor outreach — the DBE/MBE/WBE goal percentage for each underlying NYSDOT contract isn't stated in the radar listing either, so a sub still has to pull the individual ad to see the full requirement.