The city's Department of Design and Construction broke ground on a new comfort station at Kissena Park in Queens, marking another project delivered through DDC's design-build restroom program, the agency announced Monday.

Design-build means one contract covers both the drawings and the construction — a single team is on the hook for design and shovels both, instead of an owner hiring an architect first and bidding construction separately later. DDC has leaned on this delivery method specifically for its parks restroom program, where the agency has pushed to standardize a repeatable building type across dozens of sites citywide.

The Kissena Park comfort station is one entry in a program that spans multiple boroughs; DDC's public project tracker lists other restroom replacements working through design and construction at the same time. For a GC or sub chasing this work, the pattern matters more than any single site: DDC is running this as a pipeline, not a one-off, which means a design-build team that lands one restroom job is positioned to bid the next one using largely the same drawings and systems.

The announcement, first reported by EIN Presswire via a DDC release, did not include a contract value or completion date for the Kissena Park site specifically. NYC Parks' capital project tracker carries status updates for restroom projects citywide, though not always with current dollar figures attached.

Parks' own closed-bathroom count has been a running story this fall — The RFI Wire reported in October that NYC Parks had 68 closed bathrooms citywide with no open bid to fix most of them. Kissena Park's groundbreaking is one small piece of that larger backlog moving.