City inspectors recorded large cracks in the facade of the Flatbush Avenue building years before it collapsed and killed eight people, according to Department of Buildings inspection records reviewed by The New York Times and the New York Post.

The Times reported that city officials signed off on a repair plan for the building that outside engineers now call insufficient for the damage the cracks represented, according to the paper's review of permit and inspection files. The Post's separate review of DOB records reached a similar conclusion, reporting that inspectors flagged the cracking in prior visits without ordering the building vacated or mandating a more invasive structural fix.

DOB's online complaint and violation database for the address does not yet show a consolidated post-collapse investigative file, something The RFI Wire has noted in its own coverage of the collapse since the building came down on Flatbush Avenue. The gap between what two newsrooms found in the historical inspection record and what the department's own public portal currently shows is the story for contractors who work facade and structural repair in the city: the paper trail on a known crack can sit in the file for years without forcing a fix.

Separately, NBC New York and Realtor.com reported this week that the engineering firm connected to excavation work tied to the collapse site has faced prior negligence allegations in other matters, according to court filings the outlets reviewed. Those allegations are civil claims, not findings of fault, and the firm has not been charged criminally in connection with the Flatbush collapse.

For a contractor or engineer doing facade or foundation work in New York, the lesson sitting inside these two reviews is procedural: a documented crack that gets a patch instead of a full structural assessment doesn't close the file, it just moves the risk downstream — to whoever owns or works the building next, and eventually to whoever DOB or a plaintiff's lawyer asks why nobody escalated it.