NYC Transit put out a call for project management and construction services to replace the Long Island Rail Road Fresh Pond Yard Truss Bridge. The solicitation runs under number CR#2140640 and bids are due December 17.

The posting does not state an estimated value or specific subcontracting goals.

The existing 176-foot steel truss bridge in Glendale, Queens, was built in 1916 and currently operates under a restricted 10-mile-per-hour maximum speed. The work involves designing and building an off-line replacement structure over five non-electrified tracks, with a waiver already granted by state transportation officials for a 19-foot vertical clearance.

This matters to a management firm because coordinating an off-line bridge swap over live rail tracks is a high-risk logistical puzzle. The agency needs a team that can handle the design-build oversight without disrupting yard operations.

Download the solicitation to see the exact management scope required, and submit your proposal by the December 17 deadline.

On the record: CS00075L - PMC Services for the Replacement of LIRR Fresh Pond Yard Truss Bridge on the Bay Ridge Branch (State)., issued by MTA - NYC Transit (NYCT). Solicitation CR#2140640. Bids are due December 17, 2026. The listing on NY State Contract Reporter: https://www.nyscr.ny.gov/Ads/Details/2140640. Full record on The RFI Wire's board: https://therfiwire.com/rfi/RFI-005200.html.