Bid Result

RECONSTRUCTION OF EXISTING SEWERS, THE BRONX

AgencyNYC DDC
Solicitation8502026SE0013C
TradeSewer
LocationBronx
Bids openedSeptember 14, 2026
Bidders2
Apparent lowMASPETH SUPPLY CO, LLC — $5,277,687
Engineer's estimate$7,000,000
Spread66.1% (second-low vs. low)
First listedSeptember 16, 2026
RecordRFI-002410

Apparent low bidder: MASPETH SUPPLY CO, LLC at $5,277,686.55 — preliminary per DDC, subject to verification and not yet a confirmed award. 2 bids received. DDC engineer's estimate: $7,000,000.00.

BidderBid
MASPETH SUPPLY CO, LLC$5,277,687
JRCRUZ CORP.$8,767,876

Results as read at the public bid opening; subject to review and award. The apparent low bidder is not the awardee until the owner makes an award.

NYC DDC construction contracts (preliminary bid results & awards) → The live bid board

Always confirm dates and requirements on the issuing agency's own posting before pricing a job — dates move, and addenda are what move them. Search everything · All projects · Get The Punch List
© The RFI Wire · A Managed Construction Publication