The RFI Wire

HomeThe RFP Wire › RFI-001987

Subs Wanted · Closed

7EM Deer Park Switchgear Replacement — subs sought

AgencySub via Haugland Energy Group LLC
LocationDeer Park, Suffolk County, NY
Quotes dueSeptember 10, 2026
Prime seeking subsHaugland Energy Group LLC
StatusClosed — this listing is no longer open
First listedSeptember 8, 2026
RecordRFI-001987

Haugland Energy is seeking DBE, MBE and SDVOB subcontractors on the 7EM Deer Park switchgear replacement for PSEG Long Island — installing 15kV feeders and the incoming and bus-tie cables on switchgears 1, 2 and 3. The two scopes it is buying out are electrical conduit and HDPE material supply, and vacuum excavation. Every subcontractor has to be registered in ISNetworld with a grade of C or better, so check that before you spend time on a number. Participation goals on the job are 15% MBE, 15% DBE and 6% SDVOB. Bid date is September 10.

Prime contractor sub-bid advertisement → Subs Wanted board

Always confirm dates and requirements on the issuing agency's own posting before pricing a job — dates move, and addenda are what move them. Search everything · All projects · Get The Punch List
© The RFI Wire · A Managed Construction Publication