The RFI Wire

Home › The RFP Wire › RFI-001020

Bid Result

HS 382 (K) New 5-Story School Building with Full Cellar

3 firms bid on HS 382 (K) New 5-Story School Building with Full Cellar; bids were opened on Wednesday, June 11, 2025. Navillus Contracting d/b/a Navillus Tile, Inc. was the apparent low bidder at $107,403,000. The next bid was $107,670,000, 0.2% higher. The apparent low bidder is not the awardee until the owner makes the award.

Bids openedJune 11, 2025
Bidders3
Apparent lowNavillus Contracting d/b/a Navillus Tile, Inc. — $107,403,000
Spread0.2% (second-low vs. low)
RecordRFI-001020

Apparent low bidder: Navillus Contracting d/b/a Navillus Tile, Inc. at $107,403,000 - from bid-opening records, subject to verification and not yet a confirmed award. 3 bids received.

BidderBid
Navillus Contracting d/b/a Navillus Tile, Inc.$107,403,000
Adam's European Contracting, Inc$107,670,000
Arnell Construction Corporation$127,484,000

Results as read at the public bid opening; subject to review and award. The apparent low bidder is not the awardee until the owner makes an award.

The live bid board

Always confirm dates and requirements on the issuing agency's own posting before pricing a job — dates move, and addenda are what move them. Search everything · All records · All projects · Get The Punch List
© The RFI Wire