Facade Repair at 4th Avenue–9th Street Station

AgencyMTA NYC Transit
SolicitationA35355
TradeFacade/Restoration
LocationPark Slope, Brooklyn
Bids dueSeptember 3, 2026
Est. value$10M-$50M (MTA est. range)
StatusClosed — this listing is no longer open
First listedAugust 4, 2026
RecordRFI-000046

Rehabilitation of the historic viaduct station's south-facing brick facade: brick veneer out and replaced west of the westerly control tower, concrete and steel-framing repairs, every window assembly replaced, new steel lintels, limestone coping reset, and the existing sidewalk shed comes down. A+B contract — bidders bid schedule as well as price, capped at 580 days. Goals: 15 percent MBE, 15 percent WBE, 6 percent SDVOB, plus a 50 percent Enhanced Utilization Credit for EUCI-eligible firms. Bids open September 3. Also advertised as CR#2137277.

Part of Facade Repair at 4th Avenue - 9th Street Station: the agency bid, every request for subs and the plan holders on this job, on one page.

Bids have been opened on this job — see the results (RFI-001890).