The RFI Wire

HomeThe RFP WireProjects

Project

Design-Build ADA Upgrades - Package 11

On this job: 2 agency solicitations. 4 firms are on the agency's public plan-holder lists.

Owner / agencyMTA NYC Transit
LocationNYC stations
SolicitationsA37815

The bid

ListingSolicitationBids dueStatus
Design-Build ADA Upgrades — Package 11A37815September 3, 2026Closed
Design-Build ADA Upgrades - Package 11A37815October 16, 2026Open

Who took out plans

Took out plans (4)

From the Agency plan-holder list.

A firm on a plan-holder list has downloaded or picked up the bid documents; it has not necessarily bid. Primes that want subs on a job post it on the Subs Wanted board.

Always confirm dates and requirements on the issuing agency's own posting before pricing a job — dates move, and addenda are what move them. Search everything · All projects · Get The Punch List
© The RFI Wire · A Managed Construction Publication